System and method of using a compressed air storage system with a gas turbine

Details for Australian Patent Application No. 2010233045 (hide)

Owner General Electric Company

Inventors Finkenrath, Matthias; Naidu, Balachandar; Booth, Charles Michael; Ferguson, Garland; Hoffmann, Stephanie Marie-Noelle; Freund, Sebastian Walter

Agent Phillips Ormonde Fitzpatrick

Pub. Number AU-A-2010233045

Priority 12/606,761 27.10.09 US

Filing date 13 October 2010

Wipo publication date 12 May 2011

International Classifications

F02C 6/16 (2006.01) Plural gas-turbine plants

F02C 6/02 (2006.01) Plural gas-turbine plants

F02C 7/36 (2006.01) Features, component parts, details or accessories, not provided for in, or of interest apart from, groups

F02C 9/00 (2006.01) Controlling gas-turbine plants

Event Publications

4 November 2010 Complete Application Filed

  Priority application(s): 12/606,761 27.10.09 US

12 May 2011 Application Open to Public Inspection

  Published as AU-A-2010233045

Legal

The information provided by the Site not in the nature of legal or other professional advice. The information provided by the Site is derived from third parties and may contain errors. You must make your own enquiries and seek independent advice from the relevant industry professionals before acting or relying on any information contained herein. Check the above data against the Australian Patent Office AUSPAT database.

Next and Previous Patents/Applications

2010233046-Power ramp rate control for renewable variable power generation systems

2010233044-Method for use in multiphase flow